When should you start?

Pick the month you want to move in. We’ll show you when each step needs to begin, based on how long Sisu builds take: about 10 to 16 months from the first meeting to keys.

    · 01

    Where the months go.

    · 01

    First meeting and lot check

    What you want, the lot you have or need, zoning, utilities and drainage.

    · 02

    Talk to a lender

    What a construction loan will support, before you fall for a floor plan.

    · 03

    Design

    Schematic design, design development, then construction documents.

    · 04

    Budget and permits

    A budget built line by line on your plan, then the permit from the city or the county.

    · 05

    Construction

    Slab, framing, dried in, systems, insulation, drywall, finishes. Inspections along the way.

    · 06

    Keys

    Final inspection, walkthrough and keys. Your written warranty starts the same day.

    · 02

    Quick questions.

    Are these dates a promise?+

    They’re typical ranges from Sisu builds. Your lot, your plan and your permit office set the real dates, and we lay those out on your plan.

    My date is close. Is it too late?+

    Not always. Starting from one of our floor plans saves design time. Call Daniel and we’ll look at it together.

    ¿Lo tienen en español?+

    Sí. Esta página también está en español.